Pages

Wednesday, January 2, 2013

WIP 2012 Recap

From original 2012 list, here is what I finished

EQ 2011 BOM became 'Spinner' and won the layout contest hosted by Electric Quilt, also juried into Pacific Northwest Quilt Show and got a 2nd place ribbon at the Washington State Quilter's Show in Spokane, WA for Machine Quilted, Pieced, Solo; and is now juried into Road to California 2013!

Christmas MugRug
Charmed Network - 'Terrain' version ** NEW PATTERN **
Charmed Network - 'Eva' version ** NEW PATTERN **
BMCU Table Runner/Placemats/Mug Rugs
Irish Hand Block
McCall's Mystery Quilt - Spring Fling version (had to post a pic of the back too)
McCall's Mystery Quilt - RazzleDazzle version (had to post a pic of the back too)
Tulip wallhanging re-quilt (I did add this back on from 2011)


Added to the List and got finished
Linda Taylor's class project from fall MQX 2011
Hearts & Flowers Coordinating Mug Rug
Zoe -Summer School version
Zoe's raincoat
Sashiko potholder (class from Pepper Cory)
My Olympic Connection (in memory of my grandfather)
STEP on Life's Journey (donated to local women's shelter and made with our Fearless Design block swap)
Working with What You've Got (WWVQG 2009 co-chair blocks and wedding FQ basket)
WWCHS - Home Sweet Home
Kitchen door curtain







Still in progress
(from lower left counter clockwise)
-Rose of Sharon Bird Block (just binding to go)
-Skill Builder Sampler (on quilting table now)
-OWN (only 1 block this year)
-2007 Alaska Shop Hop
-Out of the Darkness













Added and in progress
  • Irena Bluhm Colored Pencil class project (finalize colorings and textile medium to be applied)
  • Valentine Jelly Roll Race (ready to quilt)
  • Honeymoon Storm at Sea
  • Fall Wallhanging
  • Christmas Friendship Star Block Lotto win in December








No progress --it just didn't happen!
Basket BOM (ready to quilt)
Peace Park
Snowflake/blizzard
2007 Shop Hop the Blues
2009 Shop Hop the Blues


Although my new studio is prompting me to organize my time differently yet again, the 10 pieces above that are not finished yet are going to be what I want to work on in 2013 ...for myself, when I have the time. There were two from 2011 that are still sitting around and I really ought to pull them out and finish them up too (mini lonestar and colorwash heart duvet which will become a quilt). I'm thinking it might be better this year to have business goals that are my priority rather than my personal WIP being the driving factor. We shall see how it all pans out, but it will be an exciting year for sure!

On the business front I've got several designs in the works that I'd like to see materalize. Being in a new locale, my mind is swirling around ideas that will symbolize the beauty and happenings here.

Maybe this will be our Lucky 13!! Happy New Year!
 

4 comments:

  1. I think you're doing great!!! Keep up the beautiful work.
    Happy New Year.
    Always, Queenie

    ReplyDelete
  2. Another good year for you. :) Yeah, business work needs priority, but your personal work is not in bad shape at all!

    ReplyDelete
  3. Beautiful work, it blows my mind to see all of it on the same page! So much accomplished.

    ReplyDelete
  4. Hi, I just found your blog when I visited Sew Cal Gal's and she reported that your Spinner quilt had been juried into Road 2 California. I met you at the WSQ show when you had just found out you won a ribbon. I was hostessing on Sunday and took your photo with your quilt. It is amazing. Congratulations on your continuing success.

    ReplyDelete